01923 447435
Main Contractor
JB Structures
Engineer
Axiom
Architect
Wolff Architecture
Contract value
£1.1m
Duration
20 Weeks

Delivery of a single storey watertight basement with ground floor and sunken garden to the rear. JBS as Principal Contractor under took all Sika, Delta, Structiral Blockwork, Sewer connections and structural steel design to delivery the scheme to the standard requeted by the client