01923 447435

Basements

The basement division has developed expertise to undertake any size of basement construction with Innovate construction methodology and construction techniques.This has allowed us to execute new engineering, construction and underpinning methods, to maximize space. Traditional underpinning techniques can be supplemented by other engineering methods such as contiguous bored piles, reinforced concrete walls and slabs to allow multiple level basements be constructed with various waterproofing solutions and techniques. We can utilise the structural engineers drawings and our own construction programme to produce 3D time slice designs that illustrate the construction process. This also allows design discrepancies or construction issues to be identified at an early stage.

case studies